COAL PORT INFORMATION

KALIMANTAN ISLAND

 

  1. Banjarmasin, Taboneo

Loading position               :

  • Handy 03 – 40 -20 South/114 – 26.5 – 00 East

(max draft abt 12 – 13m, depth abt 13 m)

  • Panamax 03 – 41 – 00 South/114 – 26.5 – 00 East

(max draft abt 14 – 15m, debth abt 17 m)

  • Capesize 03 – 42 -00 South/114 – 26.5 -00 East

(max draft abt 18 – 19m, debth abt 20 – 22 m)

Loading rate       :

  • Abt 10.000 – 15.000 mt per day by ship’s gear & grabs
  • Abt 15.000 – 20.000 mt per day per Floating Crane

Port restriction   :  No restriction (open sea)

Shipper                 : Various / PT. Adaro Indonesia.

Port charges       :

  • Harbour dues : GRT x USD 0.090 + 10% VAT
  • Light dues                : GRT x USD 0.034

 

  1. Jorong

Loading position               :

  • Handy 04 – 07.6 South/115 – 04.5  East

(max draft abt 13m)

  • Panamax 04 – 11.5 South/115 – 05.9 – 00 East

(max draft abt 16m)

  • Capesize 04 – 11.5 South/115 – 05.9 East

(max draft abt 16m)

Loading rate       : Abt 10.000  mt per day by ship’s gear & grabs

Loading Facility  : Ship’s gear & graps (* in require could provide grabs)

Port restriction   :  No restriction (open sea)

Shipper                 : PT. Jorong Barutama

Port charges       :

  • Harbour dues : GRT x USD 0.021
  • Light dues                : GRT x USD 0.034

 

  1. Satui

Loading position               :

  • Handy 03 – 53.50 South/115 – 30.50 East

(max draft abt 10m)

  • Panamax 03 – 56.00 South/115 – 31.50 East

(max draft abt 12m)

  • Capesize 03 – 57.00 South/115 – 37.00 East

(max draft abt 16m)

Loading rate       :  abt 8.000 – 10.000 mt per day by ship’s gear & grabs

Port restriction   :  No restriction (open sea)

Shipper                 : Various / PT. Arutmin Indonesia.

Loading Facility  : Ship’s gear & graps (* in require could provide grabs)

Port charges       :

  • Harbour dues : GRT x USD 0.095 + 10% VAT
  • Light dues                : GRT x USD 0.034

 

 

  1. Asam-asam

Loading position               :

  • Handy 04 – 07 -67 South/115 – 11 – 54 East

(max draft abt 18 m)

Loading rate       :

  • Abt 10.000 mt per day by ship’s gear & grabs
  • Abt 10.000 mt per day by Floating Crane

Loading Facility  : Ship’s gear & graps (* in require could provide grabs)

Floating crane (*if require could provide FC)

Port restriction   :  No restriction (open sea)

Shipper                 : PT. Arutmin Indonesia.

Port charges       :

  • Harbour dues : GRT x USD 0.035
  • Light dues                : GRT x USD 0.034

 

 

  1. Indonesia Bulk Terminal (IBT), South Pulau Laut

Loading position               :  04 – 02 South/115 – 59 East

Loading rate       : abt 34.000 – 40.000 mt per day

Loading Facility  : Fixed luffing/slewing loader

Port restriction   :  Draft 14.5m/LOAD 230m/Beam 35m/Air draft 19 m/ DWT 80.000mt

Shipper                 : PT. Adaro Indonesia.

Port charges       :

  • Harbour dues : GRT x USD 0.095 + 10% VAT
  • Quay dues : GRT x USD 0.086 x p/stay + 10% VAT
  • Pilotage : (GRT x USD 0.015 + USD 43 x 2) x 2.5 + 10% VAT
  • Light dues                : GRT x USD 0.034
  • Tuggage aspers IBT’s sport tariff (in lumpsum).
  • < 45.000 = USD.37.000 (included tax)
  • > 45.000=USD 45.000 (included tax)

 

  1. North Pulau Laut Coal Terminal
  2. Tanjung Pemancingan
  3. Sebuku
  4. Samarinda
  5. Balikpapan Coal Terminal
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s